Events
MMC Engineering Secures Three Malaysia Book of Records Awards for ADE MRO Hangar Structural Works
26 Sept 2024 / KLIA, Sepang
We are thrilled to announce that MMC Engineering has successfully achieved Three(3) Malaysia Book of Records Awards for our outstanding structural work on the Asia Digital Engineering (ADE) 14-Line Aircraft MRO Hangar at KLIA – The Longest Single Span Pre-Engineered Building (PEB) System Rafter, Longest Locally Designed Single Span Truss Frame System, and Longest Vertical Hangar Door (Megadoor).
As the main contractor, we played a crucial role in the design and construction of this cutting-edge facility, setting new standards for engineering and innovation in Malaysia. This milestone highlights our dedication to excellence in engineering and our ability to deliver large-scale infrastructure projects that not only meet but exceed industry standards.
The ADE hangar is a state-of-the-art facility that will serve as a key hub for aircraft maintenance, repair, and overhaul (MRO) in the region. Our work on the structural components of this project was instrumental in making it one of the largest and most advanced hangars in Asia.
We are honored to have partnered with AirAsia in this landmark project and look forward to continuing our journey of innovation, quality, and excellence in the engineering field.
Other Events
- MMC Engineering Strengthens Stakeholder Relations through Bowling Tournament with Ministry of Energy Transition and Water Transformation (PETRA)
- YAB Prime Minister Officiates Launch of MMC Infra Padi's Infrastructure Development Project to Support Five-Season Paddy Planting Programme Over Two Years (Phase 1)
- Signing Ceremony for The Development of the Project to Support the Five (5) Seasons in Two (2) Years Paddy Cultivation
- MMC Engineering Secures Three Malaysia Book of Records Awards for ADE MRO Hangar Structural Works
- InnoTrans 2024: MMCE Reaches Key Milestones with Strategic Partnerships for the Penang LRT Project
- Pertandingan Badminton 3 Penjuru (PETRA-JPP-MMCE)
- Phase 1 Handover of the Northport (Malaysia) Berhad Container Terminal Yard Block K (NMBCTYK) Project
- ADE MRO Hangar Project: 500k Man-hours without Loss Time Injury (LTI)
- Mini Badminton Tournament
- Program Mesra Majikan PPZ- MAIWP Bersama Ustaz Don Daniyal