Water &
Waste Water

Semangar Water Treatment Plant

  • START DATE
    11th April 2011
  • PROJECT TITLE
    Proposed Upgrading, Rehabilitation and Extension of Existing Semangar Water Treatment Plant, Kota Tinggi. Package 1 - Construction of Treatment Works
  • PROJECT AMOUNT
    RM28,300,500.00
  • FINISH DATE
    14th November 2012
  • CLIENT
    Pengurusan Aset Air Berhad (PAAB)
  • DESCRIPTION OF PROJECTS
    • Earthworks
    • Drainage works
    • Construction of Aerator & Mixing Tank, Contact & BuffetR Tank, 1.4ML Elevated Tank, Workshop, Open Yard, Sludge Lagoon, Pipeworks, Intake Improvement Works, Infrastructure works, and Chemical Pipe and Cable Ducting.
Copyright © 2020 MMC Engineering.
All rights reserved.
MMC Engineering Sdn Bhd is a wholly-owned subsidiary of MMC Corporation Berhad.