Skip to main content

Tunnel

Langat Sewerage Network - Tunnel

  • START DATE

    20th November 2015

  • PROJECT TITLE

    Cadangan Pembinaan Langat Centralised Sewerage Treatment Plant (CSTP) Dan Penyambungan Rangkaian Paip Pembetungan Di Kawasan Tadahan Lembangan Sungai Langat Secara Reka dan Bina

  • FINISH DATE

    February 2023

  • CLIENT

    Jabatan Perkhidmatan Pembetungan, JPP

  • DESCRIPTION OF PROJECTS

    Completed Critical Tunneling Packages for the 108km Langat Sewerage Network Project

    TBM Type: Herrenknetch AG (Germany), capacity 315kW

    TBM Bore Diameter: ID1800/OD2200 with the capacity of 315kW

    TBM Length: Malaysia Book of Records, The Longest Microtunneling Diameter Nominal 1800 Multi Curvature Sewerage Pipeline in Full Rock

    Underground Geology: Hard abrasive full rock formation

    The TBM was dubbed as a Ferrari compare to other TBM of the same size designed to penetrate in extreme rock formation with special cooling system. Hydraulic and heat management system is 5 times more efficient that normal DN1800 machine of its same dimensions.