Electrified Double Track Project - Berapit Tunnel & Larut Tunnel

  • CONSTRUCTION PERIOD
    2008-2014
  • PROJECT AMOUNT
    RM12.5b (~ USD 3.1b)
  • DESCRIPTION OF PROJECTS
    • 330km infrastructure and system works, link 4 states of Perak, Kedah, Penang & Perlis
    • Signalling & Control
    • Electrification
    • Trackworks
    • Power
    • Communication
  • TOTAL LENGTH
    330km
  • NO. OF STATIONS
    • 7 major
    • 14 minor
    • 10 halts
    • 3 depot
  • TUNNELS
    • Bukit Berapit 3.3km
    • Larut 0.3km
  • BRIDGES
    • ROB 66 nos.
    • RUB 8 nos.
    • River crossing 75 nos.
    • Pedestrian 45 nos.
  • SPECIAL STRUCTURE
    • Swing bridge 282m
    • Marine viaduct 3.5km