Electrified Double Track Project - Berapit Tunnel & Larut Tunnel
-
CONSTRUCTION PERIOD
2008-2014
-
PROJECT AMOUNT
RM12.5b (~ USD 3.1b)
-
DESCRIPTION OF PROJECTS
- 330km infrastructure and system works, link 4 states of Perak, Kedah, Penang & Perlis
- Signalling & Control
- Electrification
- Trackworks
- Power
- Communication
-
TOTAL LENGTH
330km
-
NO. OF STATIONS
- 7 major
- 14 minor
- 10 halts
- 3 depot
-
TUNNELS
- Bukit Berapit 3.3km
- Larut 0.3km
-
BRIDGES
- ROB 66 nos.
- RUB 8 nos.
- River crossing 75 nos.
- Pedestrian 45 nos.
-
SPECIAL STRUCTURE
- Swing bridge 282m
- Marine viaduct 3.5km