PGU-I GAS PIPELINE (GRAPHITE)

The Project includes for the MMCEC-MMCOG-SEW Joint Venture (JV) to install an approximate 33km long NPS36 (36”) pipeline with associated pipeline facilities together with abandonment and demolition of some existing facilities. The pipeline will commence from Gas Processing Kertih (GPK) and then terminate at tie-in point in M1 Station. The pipeline will be installed alongside the existing NPS3 (36”) loop 1 Gas pipeline, NPS12 (12”) Liquid Propane pipeline and two (2) NPS8 (8”) Liquid Butane pipelines in the same nominally 90m to 40m wide right of way for most of the 33km pipeline route
  • START DATE
    2nd December 2019
  • PROJECT TITLE
    Engineering, Procurement, Construction And Commissioning (EPCC) Of PGU-I Gas Pipeline Replacement Project (GRAPHITE)
  • PROJECT AMOUNT
    RM150 million
  • FINISH DATE
    1 November 2022
  • CLIENT
    PETRONAS Gas Berhad