Power,
Oil & Gas

Cross Country Pipeline Projects

  • PENINSULAR GAS UTILIZATION PROJECT -STAGE II
    An infrastructure development project to process and transmit natural gas fed from the fields offshore Terengganu to end-users in the power, industrial and commercial sectors. The entire PGU system comprises gas transmission pipelines, supply pipelines and laterals. The Division was involved in PGU Stage II, constructing a 730-km trans-Peninsular main pipeline connecting the western and southern parts of Peninsular Malaysia as well as Singapore, and related supporting facilities
  • THE PENINSULAR GAS UTILIZATION PROJECT - LOOP 2
    Involving the procurement, construction and commissioning of a 230-km 36-inch natural gas pipeline from Segamat in Johor to Meru in Selangor, parallel to the existing main PGU line, and the upgrading of 40-km of the existing 36-inch pipeline. The PGU Loop 2 project, was undertaken by Petronas Gas to further enhance the capacity, integrity and security of the PGU gas transmission system
  • EPCC OF EXPORT PIPELINE (SEGMENT B1), MELUT BASIN OIL DEVELOPMENT PROJECT, REPUBLIC OF SUDAN
    MMC led a consortium comprising MMC, Sinopec of China and TOCO of Oman MST which provided EPCC works for a 490-km export pipeline in the Republic of Sudan. This pipeline allows the oil reserves from Blocks 3 & 7 of the Melut Basin to be transported to the Central Processing Facility, and exported to a new Marine Terminal at Port Sudan.
Copyright © 2020 MMC Engineering.
All rights reserved.
MMC Engineering Sdn Bhd is a wholly-owned subsidiary of MMC Corporation Berhad.