Highway & Bridge

Bukit Merah Viaduct

The longest stretches of railway viaduct within Northern Double Tracking project.
  • CONSTRUCTION PERIOD
    2008 - 2013
  • PROJECT TITLE
    Bukit Merah Viaduct
  • DESCRIPTION OF PROJECTS
    • The longest stretches of railway viaduct within Northern Double Tracking project
    • 3.5km and total deck around 41,000m2
Copyright © 2020 MMC Engineering.
All rights reserved.
MMC Engineering Sdn Bhd is a wholly-owned subsidiary of MMC Corporation Berhad.