Access Road Connecting to Sg. Pulai Bridge

  • START DATE

    14 June 2021

  • PROJECT TITLE
    The Proposed Petrochemical & Maritime Industry Centre Development at Tanjung Bin, Pontian, Johor Darul Takzim - Construction of Access Road Connecting to Sg. Pulai Bridge
  • PROJECT AMOUNT

    RM60.49 million

  • FINISH DATE

    8 May 2023

  • CLIENT

    Senai Airport Terminal Services Sdn Bhd

  • DESCRIPTION OF PROJECTS

    • Site clearance and demolition works
    • Earthworks
    • Drainage works
    • Pavement works include construct new flexible pavement, install road furniture include signboards, traffic barriers, road markings, kilometre post, kerbs, channels, edging and delineator
    • Geotechnical works include to provide ground treatment, prefabricated vertical drain, piled embankment, slope protection and provide instrumentation and monitoring
    • To construct bridges at Sungai Cengkeh Besar and Sungai Boh Kiri, including installation of bored piles, substructures (abutments and piers), superstructures (post-tensioned prestressed beams, deck slab, precast concrete parapet wall) include pavement on bridges and retaining structures for approach road
    • Provide environmental protection that includes Environment Management Plan, Erosion & Sediment Control Plan, temporary earth drain and check dam
    • Provide environmental monitoring that includes water quality monitoring, air quality monitoring, noise monitoring and biological monitoring
    • To provide street lighting works that includes ducting, feeder pillar, cabling for feeder pillar, sub-circuit wiring and electrical fitting
    • River training works