The Proposed Petrochemical & Maritime Industry Centre Development at Tanjung Bin, Pontian, Johor Darul Takzim - Construction of Access Road Connecting to Sg. Pulai Bridge
PROJECT AMOUNT
RM60.49 million
FINISH DATE
8 May 2023
CLIENT
Senai Airport Terminal Services Sdn Bhd
DESCRIPTION OF PROJECTS
Site clearance and demolition works
Earthworks
Drainage works
Pavement works include construct new flexible pavement, install road furniture include signboards, traffic barriers, road markings, kilometre post, kerbs, channels, edging and delineator
Geotechnical works include to provide ground treatment, prefabricated vertical drain, piled embankment, slope protection and provide instrumentation and monitoring
To construct bridges at Sungai Cengkeh Besar and Sungai Boh Kiri, including installation of bored piles, substructures (abutments and piers), superstructures (post-tensioned prestressed beams, deck slab, precast concrete parapet wall) include pavement on bridges and retaining structures for approach road
Provide environmental protection that includes Environment Management Plan, Erosion & Sediment Control Plan, temporary earth drain and check dam
Provide environmental monitoring that includes water quality monitoring, air quality monitoring, noise monitoring and biological monitoring
To provide street lighting works that includes ducting, feeder pillar, cabling for feeder pillar, sub-circuit wiring and electrical fitting